Cubicle Lift

You Don't Have to Move Out to Replace your Flooring

How occupied remodel and cubicle lift let facilities managers finally deal with the carpet they've been putting off

Most facilities managers have a flooring project that's been on the list longer than it should be. Usually it's a main office space — worn traffic lanes, dated carpet, the kind of wear that isn't an emergency but is noticeable when a client walks through.

The reason it stays on the list is almost never the flooring itself. It's what replacing the flooring requires: emptying the floor. Price the project and you tend to arrive at the same place — the carpet isn't the obstacle. Emptying the floor is the obstacle.

Why this project keeps getting deferred

Replacing flooring in an occupied office isn't a flooring decision. It's a logistics decision, and the logistics are what puts it off.

Under the conventional approach, someone on your team owns a project plan that includes:

  • Boxing up all work and personal items.

  • Breaking down and reassembling every workstation on the floor

  • Disconnecting and reconnecting power and data at every desk

  • Staging furniture somewhere — another floor, a conference room, a storage container in the lot

  • Finding somewhere for those employees to sit, or sending them home

  • Coordinating IT, the furniture vendor, the flooring contractor, and building management into the same window

  • Absorbing the days of lost productivity while all of it happens

That's not a maintenance project. That's a move. And the honest math on a move is that the disruption often costs more than the carpet does.

So it gets deferred. Not out of neglect — out of a completely reasonable read of the tradeoff. Every facilities director, office manager, and property manager we talk to has at least one of these on the list. Some have three.

Here's the part most of them don't know: that tradeoff isn't the only one available.

What cubicle lift actually is

Cubicle lift is a lift-and-replace system. The cubicles and desks are raised in place — with the monitors, the files, the cords, and the framed photos still on them — the old flooring is removed underneath, the new flooring goes down, and the workstations are set back into position.

Nothing gets broken down. Nothing gets moved off the floor.

The work happens after hours. Employees leave on a worn floor and come back the next morning to a new one.

"We waited too long to replace the carpet in the main office space of our headquarters. It was worn and looked unprofessional, especially when meeting with customers. The folks at CF&I told us about their lift and replace system, where they literally lift the cubicles and desks, tear out the old carpet and replace with the new. Our employees came in the next day to fresh carpet and no hassles."

— CF&I client

That's the whole pitch, and it's why we lead with it: the objection is disruption, and the answer is that the disruption doesn't happen.

What your day looks like

Before. CF&I provides carts and boxes so the employee can box up work and personal items. We walk the space, take measurements, and identify anything that does need to be handled separately — a server closet, a lab bench, an oversized conference table. You get a scope and a schedule.

The night of. Our crew arrives after your people leave. Furniture comes up, old flooring comes out, new flooring goes in, furniture comes back down.

The next morning. Your team badges in and walks onto new flooring. The work and personal effects can be unpacked.

What you had to do: tell your team not to leave anything loose on the floor, and unlock the door.

The list of things that don't happen

This is the part worth reading twice, because it's where the deferred project stops being a project.

  • No furniture disassembly or reassembly

  • No offsite furniture storage or staging space

  • No temporary seating plan

  • No employees working from home for a week

  • No phased floor-by-floor schedule dragging across a quarter

  • No coordinating four vendors into one window

The reason the project has been sitting on your list is that it required all of that. It doesn't.

The easy way out of a deferred project

If you've been carrying this one, the next step is smaller than you think. A consultation takes under an hour and doesn't obligate you to anything. You'll come out of it with a scope, a realistic schedule, and a number — enough to bring to whoever signs.

Bring what you have. If you know the square footage, great. If you know roughly how many workstations are on the floor, better. If all you know is "the carpet in the north wing is shot," that's enough to start.

Contract Flooring & Interiors has been handling commercial flooring installation and maintenance across Oregon and Southwest Washington since 2003 — including work at the Portland Art Museum, Hillsboro Hops Stadium, Wildhorse Resort & Casino, and many more large and small projects.

The floor you've been putting off doesn't require a move. It requires a night.

Request a consultation→